Today we have accomplished the installation of the Me Orion to the robot. What we did first was use the spacers to hold the Me Orion on the chassis of the vehicle. Then we started connecting the motors cables to the Me Orion which are at the bottom, and also the cable for the remote control infrared for the controller, and the cable of the battery holder where is connect at the top of it next to the switch.
#ScrewPropulsion Day12 Installation of the Me Orion.
May 30, 2019
Tags:
More to Discover